Donate using PayPal

All photos in & around Lancaster

Showing items 1 to 100 from total of 294 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
149378Photo #149378Route signs for the Cumbria and Lancashire Cycleways (also NCN route 6 to the right)Route sign:
Infrastructure
routesigns
149377Photo #149377Route signs and touring folder on NCN route 6Route sign:
Infrastructure
routesigns
149375Photo #149375Route signs on NCN route 6 and the Lancashire CyclewayRoute sign:
Infrastructure
routesigns
149374Photo #149374Route sign on the Lancashire CyclewayRoute sign:
Infrastructure
routesigns
149369Photo #149369Route signs on NCN route 6Route sign:
Infrastructure
routesigns
149366Photo #149366Junction of NCN routes 90 and 700, WartonRoute sign:
Infrastructure
routesigns
149364Photo #149364Route sign on NCN routes 6, 90 and 700, WartonRoute sign:
Infrastructure
routesigns
149363Photo #149363Route sign on the Lancashire Cycleway at CarnforthRoute sign:
Infrastructure
routesigns
149362Photo #149362Route signs on the Lancashire Cycleway at Carnforth stationRoute sign:
Infrastructure
routesigns
149361Photo #149361Cycle stands and lockers at Carnforth stationCycle parking:
Infrastructure
cycleparking
149358Photo #149358Link to the Lancaster Canal in CarnforthCycleway:
Infrastructure
cycleways
149357Photo #149357Steps and wheeling channel where NCN routes 6 and 700 leave the Lancaster Canal (to bypass Carnforth)Obstruction:
Problem
obstructions
149356Photo #149356Steps and wheeling channel where NCN routes 6 and 700 leave the Lancaster Canal (to bypass Carnforth)Obstruction:
Problem
obstructions
149355Photo #149355Swing bridge over the Lancaster Canal on NCN route 6Cycleway:
Infrastructure
cycleways
149353Photo #149353NCN route 6 giving a view to Morecambe BayCycleway:
Infrastructure
cycleways
149345Photo #149345Steps to Village Centre, meaning Hest BankCycleway:
Infrastructure
cycleways
149344Photo #149344NCN route 6 in Hest BankCycleway:
Infrastructure
cycleways
149343Photo #149343Sign to Village Centre, meaning Hest BankRoute sign:
Infrastructure
routesigns
149342Photo #149342NCN route 6 by the Lancaster CanalCycleway:
Infrastructure
cycleways
149341Photo #149341NCN route 6 passing below the Bay Gateway roadCycleway:
Infrastructure
cycleways
149340Photo #149340Junction of NCN route 6 and the Bay Gateway roadCycleway:
Infrastructure
cycleways
149339Photo #149339The Lancaster Canal towpathCycleway:
Infrastructure
cycleways
149338Photo #149338NCN route 6 leaves the Lancaster Canal here because it takes a very long way around to Lancaster.Route sign:
Infrastructure
routesigns
149337Photo #149337NCN route 6 takes this link down to the Lancaster Canal - I don't think there's a signCycleway:
Problem
cycleways
149336Photo #149336Alternative route to the Lancaster CanalRoad environment:
Infrastructure
road
149335Photo #149335Signs for alternative route from Lancaster to KendalRoute sign:
Infrastructure
routesigns
149333Photo #149333Route sign on NCN route 6 to the Lancaster CanalRoute sign:
Infrastructure
routesigns
149332Photo #149332Route sign on NCN route 6, LancasterRoute sign:
Infrastructure
routesigns
149330Photo #149330NCN route 6 leaving Ryelands Park, LancasterCycleway:
Infrastructure
cycleways
149329Photo #149329Barriers on link west from Ryelands Park, LancasterObstruction:
Infrastructure
obstructions
149328Photo #149328Narrow bridge from Ryelands Park, LancasterCycleway:
Infrastructure
cycleways
149327Photo #149327NCN route 6 is supposed to give way to a seemingly less important route in Ryelands Park, Lancaster - but why do there have to be Give Way markings at all?Cycleway:
Infrastructure
cycleways
149326Photo #149326NCN route 6 tuns left in Ryelands Park, LancasterRoute sign:
Infrastructure
routesigns
149325Photo #149325Parallel routes - two shared-use paths and a short bus/bike lane inbetween.Cycleway:
Infrastructure
cycleways
149324Photo #149324NCN route 6 marker now on the toucan crossing (see #87524)Route sign:
Infrastructure
routesigns
149323Photo #149323Off-road route and parallel shared bus/bike laneCycleway:
Infrastructure
cycleways
149322Photo #149322NCN routes 6, 69 and 700, LancasterCycleway:
Infrastructure
cycleways
149321Photo #149321Underpass on NCN route 6, LancasterCycleway:
Infrastructure
cycleways
149319Photo #149319Route signs at the north end of the Millennium Bridge, Lancaster (NCN routes 6, 69 and 700)Route sign:
Infrastructure
routesigns
149281Photo #149281Cycle parking and the Millennium Bridge, LancasterCycle parking:
Infrastructure
cycleparking
149280Photo #149280Ramped access and gate in the flood wall by the riverside cycleway (NCN routes 6 and 700) from Glasson Dock to LancasterCycleway:
Infrastructure
cycleways
149279Photo #149279Stepped access over the flood wall to the riverside cycleway (NCN routes 6 and 700) from Lancaster to Glasson DockObstruction:
Infrastructure
obstructions
149277Photo #149277One cycle stand, a bit close to the wallCycle parking:
Infrastructure
cycleparking
149274Photo #149274The riverside cycleway (NCN routes 6 and 700) from Glasson Dock to Lancaster with makeshift segregation beneath the railway viaductCycleway:
Infrastructure
cycleways
149272Photo #149272Awkward kink on the riverside cycleway (NCN routes 6 and 700) from Glasson Dock to LancasterCycleway:
Infrastructure
cycleways
149271Photo #149271Awkward kink on the riverside cycleway (NCN routes 6 and 700) from Lancaster to Glasson DockCycleway:
Infrastructure
cycleways
149270Photo #149270The riverside cycleway (NCN routes 6 and 700) from Glasson Dock to LancasterCycleway:
Infrastructure
cycleways
149269Photo #149269The Lancaster riverside cycleway (NCN routes 6 and 700) towards Glasson DockCycleway:
Infrastructure
cycleways
149267Photo #149267Cyclist passing on the Lancaster riverside cycleway (NCN routes 6 and 700)Cycleway:
Infrastructure
cycleways
149266Photo #149266This will be a decent link when proper dropped kerbs are installed.Cycle parking:
Problem
cycleparking
149265Photo #149265The usual semi-finished look of a new housing development, with piles of asphalt instead of proper dropped kerbs.Road environment:
Problem
road
149263Photo #149263Exit from new housing development towards Lancaster stationCycleway:
Infrastructure
cycleways
149262Photo #149262Access to a new housing development in LancasterCycleway:
Infrastructure
cycleways
149261Photo #149261Routes past Giant Axe Field (?!), LancasterCycleway:
Infrastructure
cycleways
149260Photo #149260Cyclists Dismount - but I think this access to Lancaster station has been closed for years.Obstruction:
Infrastructure
obstructions
149259Photo #149259Route north from Lancaster stationCycleway:
Infrastructure
cycleways
149256Photo #149256Cycle route to Lancaster stationRoute sign:
Infrastructure
routesigns
149255Photo #149255Cycle contraflow, LancasterCycleway:
Infrastructure
cycleways
149254Photo #149254Cycleway through intersection, Lancaster (motor vehicles have to turn left)Cycleway:
Good practice
cycleways
149253Photo #149253Leisure Lakes bike shop, LancasterBike shop:
Infrastructure
bikeshops
149252Photo #149252Start of canalside cycleway, LancasterCycleway:
Infrastructure
cycleways
149251Photo #149251Start of canalside cycleway, LancasterCycleway:
Infrastructure
cycleways
149250Photo #149250Cycle stands on Queen Square, LancasterCycle parking:
Infrastructure
cycleparking
149247Photo #149247Sign reminding truck drivers that there are safety mirrors mounted on traffic lights, presumably.General sign/notice:
Infrastructure
signs
149246Photo #149246Route sign coming in to central LancasterRoute sign:
Infrastructure
routesigns
149245Photo #149245Rather a random spot for a cycle standCycle parking:
Infrastructure
cycleparking
149244Photo #149244Cycle contraflow, LancasterCycleway:
Infrastructure
cycleways
149243Photo #149243Shared-use footway and two cycle standsCycle parking:
Infrastructure
cycleparking
149242Photo #149242Map of cycle routes with shared-use path and crossingRoute sign:
Infrastructure
routesigns
149241Photo #149241Touring cyclists stop for excellent pizzaOther:
Event
general
149240Photo #149240Cycle contraflows, LancasterCycleway:
Infrastructure
cycleways
149239Photo #149239Two-way cycling on Penny St, LancasterCycleway:
Infrastructure
cycleways
149238Photo #149238No Cycling 10am to 5pm and cycle parkingCycle parking:
Infrastructure
cycleparking
149237Photo #149237Cycle contraflow and modal filter, LancasterCycleway:
Infrastructure
cycleways
149236Photo #149236No Entry to Motor Vehicles, cycle contraflow laneCycleway:
Infrastructure
cycleways
149235Photo #149235No Cycling 10am to 5pm 7 days a week? and cycle parkingGeneral sign/notice:
Infrastructure
signs
149234Photo #149234No Motor Vehicles on Sun St and cycle contraflow on Church St, LancasterGeneral sign/notice:
Infrastructure
signs
149233Photo #149233Cycle contraflow in the pedestrianised zone (ie no motor vehicles) of LancasterGeneral sign/notice:
Infrastructure
signs
149232Photo #149232Crossing to Church Street contraflow lane, LancasterCycleway:
Infrastructure
cycleways
149231Photo #149231Cut-through to Lancaster castleCycleway:
Infrastructure
cycleways
149230Photo #149230No Cycling 10am to 5pm - 7 days a week?General sign/notice:
Infrastructure
signs
149229Photo #149229Two cyclists in the Lancaster pedestrian zoneCycleway:
Infrastructure
cycleways
149228Photo #149228Cut-through in LancasterOther:
Infrastructure
general
149227Photo #149227Battered cycle stands - and the orange sign boasts 'parking for 300 cars'Cycle parking:
Infrastructure
cycleparking
149226Photo #149226Cycle parking on Dalton Square, LancasterCycle parking:
Infrastructure
cycleparking
149225Photo #149225Pop-up Covid-19 closure of Dalton Square, Lancaster (the farmers' market has moved here)Temporary closure:
Good practice
closure
149224Photo #149224Pop-up Covid-19 closure of Dalton Square, Lancaster (the farmers' market has moved here)Temporary closure:
Good practice
closure
149223Photo #149223Route sign, LancasterRoute sign:
Infrastructure
routesigns
149222Photo #149222End of cycle lane, with just a warning sign to drivers.Road environment:
Infrastructure
road
149221Photo #149221Crossing between shared-use footways, LancasterCycleway:
Infrastructure
cycleways
149220Photo #149220A shame not to have a direct crossing to the closed road opposite.Road environment:
Infrastructure
road
149219Photo #149219Route sign and short stretch of shared-used footway to reach a crossingCycleway:
Infrastructure
cycleways
149218Photo #149218Cycle parking and contraflow lane, LancasterCycleway:
Infrastructure
cycleways
149217Photo #149217Car and cycle parking between the contraflow lane and carriagewayCycle parking:
Good practice
cycleparking
149216Photo #149216Contraflow cycle lane and route map, LancasterRoute sign:
Infrastructure
routesigns
149215Photo #149215Contraflow cycle lane, LancasterCycleway:
Good practice
cycleways
149214Photo #149214Cycle lane, LancasterCycleway:
Infrastructure
cycleways
149213Photo #149213Lots of space for cycles in the middle of this intersectionCycleway:
Good practice
cycleways
149212Photo #149212Clearly too many drivers are cutting into this cycle lane.Cycleway:
Problem
cycleways
149211Photo #149211Toucan crossing and big ASL, LancasterRoad environment:
Infrastructure
road

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://lancaster.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.